Recorded webinar: Enhance your production schedule in BC with Gantt charts

Visit Website View Our Posts

Summary

The most common challenge every manufacturing planner faces is to build a production schedule that truly works. With this in mind, at Netronic we developed two visual production schedulers. It should be noted that both schedulers integrate with the manufacturing module of Microsoft Dynamics 365 Business Central. At the same time, both extensions share the same goal: To ensure you have all the information you need to make an on-point production plan. These are the Visual Production Scheduler (VPS) and the Visual Advanced Production Scheduler (VAPS).

In this webinar, we schedule the same production order three times, to show you the differences between using Business Central out-of-the-box, compared to enhancing your experience with an interactive Gantt chart:

  1. We schedule production orders using the out-of-the-box capabilities of Dynamics 365 Business Central
  2. Then, we create a schedule with Business Central plus our visual drag & drop scheduler VPS
  3. Finally, we plan production orders with Business Central plus our (automatic) finite capacity scheduler VAPS

In this webinar you will learn how to enhance your production schedule in Business Central:

  • How drag&drop works in a visual production planner and why it matters
  • To make changes to your schedule and see the impact it has on other production orders
  • To reassign an operation from one machine to another
  • How your setup times, runtimes, wait times, and transport times can be better handled in the schedule
  • The difference between working with the standard Business Central towards using a visual scheduler

 

If the video doesn't load you can click here.

Want to learn more?

Leave a Comment

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Show Buttons
Hide Buttons